Pumps, which are various industrial hydraulic machines, today, without exaggeration, are one of the vital components of the life of a modern person. Production pumps are used everywhere by various companies in industrial areas, mechanical engineering, heating and cleaning systems.
Today, China occupies most of the production and distribution of pumps to various countries of the world, including the Russian Federation. The logistics component is the basis for the success of the project, so we offer only the best service for import.
Ordering and Shipping Process
After the client contacted our company for services for the delivery of goods from China on a turnkey basis and agreed on all the details of transportation and concluded a supply contract, first of all, our specialists contacted the sender to clarify the production time, terms of payment for the cargo and determine the technical characteristics. Then the payment was made to the supplier, and the goods were put into production. The total weight of this equipment during loading was 5760 kg, the volume was 12.42 m³. Based on the characteristics of the cargo, after agreement with the client, the railway method of transporting the cargo as part of a 40HC groupage container was chosen. The sender's plant, where loading was planned, was located in the city of Foshan (China), where vehicles were supplied to deliver the cargo to the Xi'an railway station, where the cargo was reloaded into a container and sent to Moscow.
The travel time from the departure station to the Elektrougli station was 18 days. Upon arrival of the cargo at the station, we carried out all the necessary procedures related to terminal cargo handling, customs clearance, and took the cargo to the client's warehouse, which was located in the city of Tambov.
Upon the arrival of the cargo at the warehouse, the consignee received all closing documents related to the purchase of the cargo.
Thus, the delivery of pumps from China as part of a railway groupage container was successfully organized and completed within the agreed time.